US Bridges

I-95 SB over Spruce Creek

Good

Volusia County, Florida · I95 SB 1 MI S of SR-421 · Structure no. 790226

Built
2017
8 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
1,152 ft
12 main spans
Daily traffic
26,010
2022 count
Owner
State
State Highway Agency

About this bridge

I-95 SB over Spruce Creek is a prestressed concrete stringer/multi-beam or girder carrying I-95 SB over Spruce Creek in Volusia County, Florida. It was built in 2017, so it is 8 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 26,010 vehicles a day, roughly 17% of them trucks, projected to reach 45,126 by 2044. The structure is 1,152 ft (351.1 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-95 SB
CrossesSpruce Creek
LocationI95 SB 1 MI S of SR-421
RouteInterstate 95
StateFlorida
Coordinates29.09076, -81.02124
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.7 US tons
Inventory rating38.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans12
Design loadHL 93
Structure length1,152 ft (351.1 m)
Longest span96 ft (29.3 m)
Deck width59 ft (18 m)
Roadway width56 ft (17.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic26,010 (2022)
Projected traffic45,126 by 2044
Trucks17%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I-95 SB over Spruce Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is I-95 SB over Spruce Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does I-95 SB over Spruce Creek carry?

About 26,010 vehicles per day (2022 count), of which roughly 17% are trucks.

How long is I-95 SB over Spruce Creek?

The structure is 1,152 ft (351.1 m) long with a longest span of 96 ft (29.3 m) and a deck 59 ft wide.

Who owns I-95 SB over Spruce Creek?

It is owned by the State Highway Agency.