US Bridges

I-95 NB over US-1

Fair

Volusia County, Florida · I-95 NB over US-1 · Structure no. 790083

Built
1964
61 years old, rebuilt 2005
Condition
Fair
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
260 ft
4 main spans
Daily traffic
35,750
2022 count
Owner
State
State Highway Agency

About this bridge

I-95 NB over US-1 is a prestressed concrete stringer/multi-beam or girder carrying I-95 NB over US-1 in Volusia County, Florida. It was built in 1964 and reconstructed in 2005, so it is 61 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 35,750 vehicles a day, roughly 14% of them trucks, projected to reach 62,026 by 2044. The structure is 260 ft (79.2 m) long and 66 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-95 NB
CrossesUS-1
LocationI-95 NB over US-1
RouteInterstate 95
StateFlorida
Coordinates29.33583, -81.13097
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.1 US tons
Inventory rating35.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length260 ft (79.2 m)
Longest span82 ft (25 m)
Deck width66 ft (20.2 m)
Roadway width63 ft (19.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic35,750 (2022)
Projected traffic62,026 by 2044
Trucks14%
Lanes on structure4
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 NB over US-1 built?

It was built in 1964, making it 61 years old in 2025. It was reconstructed in 2005.

What condition is I-95 NB over US-1 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does I-95 NB over US-1 carry?

About 35,750 vehicles per day (2022 count), of which roughly 14% are trucks.

How long is I-95 NB over US-1?

The structure is 260 ft (79.2 m) long with a longest span of 82 ft (25 m) and a deck 66 ft wide.

Who owns I-95 NB over US-1?

It is owned by the State Highway Agency.