US Bridges

CR-4118 over I-95

Good

Volusia County, Florida · 2.7MI. N of SR-44 · Structure no. 790066

Built
1969
56 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
335 ft
5 main spans
Daily traffic
7,600
2022 count
Owner
State
State Highway Agency

About this bridge

CR-4118 over I-95 is a prestressed concrete stringer/multi-beam or girder carrying CR-4118 over I-95 in Volusia County, Florida. It was built in 1969, so it is 56 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,600 vehicles a day, roughly 2% of them trucks, projected to reach 13,186 by 2044. The structure is 335 ft (102.1 m) long and 35 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesCR-4118
CrossesI-95
Location2.7MI. N of SR-44
RouteCounty Highway 0
StateFlorida
Coordinates29.04758, -81.00704
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66.5 US tons
Inventory rating41.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length335 ft (102.1 m)
Longest span87 ft (26.5 m)
Deck width35 ft (10.8 m)
Roadway width33 ft (10.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,600 (2022)
Projected traffic13,186 by 2044
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was CR-4118 over I-95 built?

It was built in 1969, making it 56 years old in 2025.

What condition is CR-4118 over I-95 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does CR-4118 over I-95 carry?

About 7,600 vehicles per day (2022 count), of which roughly 2% are trucks.

How long is CR-4118 over I-95?

The structure is 335 ft (102.1 m) long with a longest span of 87 ft (26.5 m) and a deck 35 ft wide.

Who owns CR-4118 over I-95?

It is owned by the State Highway Agency.