US Bridges

CR 361 over Clearwater Creek

Good

Taylor County, Florida · 13 MI South of US 19 · Structure no. 384109

Built
2022
3 years old
Condition
Good
inspected April 2024
Type
Slab
Concrete Continuous
Length
132 ft
1 main span
Daily traffic
2,500
2024 count
Owner
County
County Highway Agency

About this bridge

CR 361 over Clearwater Creek is a concrete continuous slab carrying CR 361 over Clearwater Creek in Taylor County, Florida. It was built in 2022, so it is 3 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,500 vehicles a day, roughly 2% of them trucks, projected to reach 4,338 by 2046. The structure is 132 ft (40.2 m) long and 43 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCR 361
CrossesClearwater Creek
Location13 MI South of US 19
RouteCounty Highway 361
StateFlorida
Coordinates29.87583, -83.60932
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67.7 US tons
Inventory rating52.2 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length132 ft (40.2 m)
Longest span33 ft (10.1 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,500 (2024)
Projected traffic4,338 by 2046
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 361 over Clearwater Creek built?

It was built in 2022, making it 3 years old in 2025.

What condition is CR 361 over Clearwater Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does CR 361 over Clearwater Creek carry?

About 2,500 vehicles per day (2024 count), of which roughly 2% are trucks.

How long is CR 361 over Clearwater Creek?

The structure is 132 ft (40.2 m) long with a longest span of 33 ft (10.1 m) and a deck 43 ft wide.

Who owns CR 361 over Clearwater Creek?

It is owned by the County Highway Agency.