I-10 WB (SR-8) over Rocky Creek
FairSuwannee County, Florida · 2.8 Mi. W. of CR-137 · Structure no. 370012
- Built
- 1968
- 57 years old, rebuilt 1989
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 250 ft
- 5 main spans
- Daily traffic
- 16,438
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-10 WB (SR-8) over Rocky Creek is a prestressed concrete stringer/multi-beam or girder carrying I-10 WB (SR-8) over Rocky Creek in Suwannee County, Florida. It was built in 1968 and reconstructed in 1989, so it is 57 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 16,438 vehicles a day, roughly 28% of them trucks, projected to reach 28,519 by 2045. The structure is 250 ft (76.2 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-10 WB (SR-8) over Rocky Creek built?
It was built in 1968, making it 57 years old in 2025. It was reconstructed in 1989.
What condition is I-10 WB (SR-8) over Rocky Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does I-10 WB (SR-8) over Rocky Creek carry?
About 16,438 vehicles per day (2023 count), of which roughly 28% are trucks.
How long is I-10 WB (SR-8) over Rocky Creek?
The structure is 250 ft (76.2 m) long with a longest span of 50 ft (15.2 m) and a deck 43 ft wide.
Who owns I-10 WB (SR-8) over Rocky Creek?
It is owned by the State Highway Agency.