US Bridges

Bexley Trail over Sabal Trail Gas R/W

Good

Sumter County, Florida · .58 Mi. SW of Meggison DR · Structure no. 184125

Built
2023
2 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
65 ft
1 main span
Daily traffic
501
2023 count
Owner
County
County Highway Agency

About this bridge

Bexley Trail over Sabal Trail Gas R/W is a prestressed concrete stringer/multi-beam or girder carrying Bexley Trail over Sabal Trail Gas R/W in Sumter County, Florida. It was built in 2023, so it is 2 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 501 vehicles a day, roughly 10% of them trucks, projected to reach 1,001 by 2042. The structure is 65 ft (19.8 m) long and 84 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesBexley Trail
CrossesSabal Trail Gas R/W
Location.58 Mi. SW of Meggison DR
RouteCounty Highway 0
StateFlorida
Coordinates28.78051, -81.97274
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51.1 US tons
Inventory rating39.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length65 ft (19.8 m)
Longest span65 ft (19.8 m)
Deck width84 ft (25.6 m)
Roadway width62 ft (18.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic501 (2023)
Projected traffic1,001 by 2042
Trucks10%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesOther
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Bexley Trail over Sabal Trail Gas R/W built?

It was built in 2023, making it 2 years old in 2025.

What condition is Bexley Trail over Sabal Trail Gas R/W in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Bexley Trail over Sabal Trail Gas R/W carry?

About 501 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is Bexley Trail over Sabal Trail Gas R/W?

The structure is 65 ft (19.8 m) long with a longest span of 65 ft (19.8 m) and a deck 84 ft wide.

Who owns Bexley Trail over Sabal Trail Gas R/W?

It is owned by the County Highway Agency.