US Bridges

I-75 SB (SR-93) over SR-48

Good

Sumter County, Florida · I-75 Interchange at SR-48 · Structure no. 180078

Built
2015
10 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
182 ft
2 main spans
Daily traffic
28,796
2023 count
Owner
State
State Highway Agency

About this bridge

I-75 SB (SR-93) over SR-48 is a prestressed concrete stringer/multi-beam or girder carrying I-75 SB (SR-93) over SR-48 in Sumter County, Florida. It was built in 2015, so it is 10 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 28,796 vehicles a day, roughly 23% of them trucks, projected to reach 49,961 by 2045. The structure is 182 ft (55.6 m) long and 59 ft wide.

CarriesI-75 SB (SR-93)
CrossesSR-48
LocationI-75 Interchange at SR-48
RouteInterstate 75
StateFlorida
Coordinates28.66867, -82.14289
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.2 US tons
Inventory rating52.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length182 ft (55.6 m)
Longest span91 ft (27.8 m)
Deck width59 ft (18 m)
Roadway width56 ft (17.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic28,796 (2023)
Projected traffic49,961 by 2045
Trucks23%
Lanes on structure3
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-75 SB (SR-93) over SR-48 built?

It was built in 2015, making it 10 years old in 2025.

What condition is I-75 SB (SR-93) over SR-48 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does I-75 SB (SR-93) over SR-48 carry?

About 28,796 vehicles per day (2023 count), of which roughly 23% are trucks.

How long is I-75 SB (SR-93) over SR-48?

The structure is 182 ft (55.6 m) long with a longest span of 91 ft (27.8 m) and a deck 59 ft wide.

Who owns I-75 SB (SR-93) over SR-48?

It is owned by the State Highway Agency.