US Bridges

Oviedo Mall Blvd over SR-417 & Bear Gully Canl

Good

Seminole County, Florida · 0.3 MI West of SR-426 · Structure no. 775502

Built
1997
28 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
388 ft
4 main spans
Daily traffic
22,500
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Oviedo Mall Blvd over SR-417 & Bear Gully Canl is a prestressed concrete stringer/multi-beam or girder carrying Oviedo Mall Blvd over SR-417 & Bear Gully Canl in Seminole County, Florida. It was built in 1997, so it is 28 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 22,500 vehicles a day, roughly 10% of them trucks, projected to reach 39,038 by 2042. The structure is 388 ft (118.3 m) long and 73 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesOviedo Mall Blvd
CrossesSR-417 & Bear Gully Canl
Location0.3 MI West of SR-426
RouteCity Street 0
StateFlorida
Coordinates28.66239, -81.22955
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating88 US tons
Inventory rating54 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length388 ft (118.3 m)
Longest span97 ft (29.6 m)
Deck width73 ft (22.2 m)
Roadway width60 ft (18.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22,500 (2023)
Projected traffic39,038 by 2042
Trucks10%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway and waterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Oviedo Mall Blvd over SR-417 & Bear Gully Canl built?

It was built in 1997, making it 28 years old in 2025.

What condition is Oviedo Mall Blvd over SR-417 & Bear Gully Canl in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Oviedo Mall Blvd over SR-417 & Bear Gully Canl carry?

About 22,500 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is Oviedo Mall Blvd over SR-417 & Bear Gully Canl?

The structure is 388 ft (118.3 m) long with a longest span of 97 ft (29.6 m) and a deck 73 ft wide.

Who owns Oviedo Mall Blvd over SR-417 & Bear Gully Canl?

It is owned by the City or Municipal Highway Agency.