I-4 WB Ramp N2 over I-4
GoodSeminole County, Florida · Ramp N2 over I-4 · Structure no. 770132
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 811 ft
- 4 main spans
- Daily traffic
- 5,400
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I-4 WB Ramp N2 over I-4 is a steel continuous stringer/multi-beam or girder carrying I-4 WB Ramp N2 over I-4 in Seminole County, Florida. It was built in 2023, so it is 2 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,400 vehicles a day, roughly 6% of them trucks, projected to reach 10,000 by 2042. The structure is 811 ft (247.1 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-4 WB Ramp N2 over I-4 built?
It was built in 2023, making it 2 years old in 2025.
What condition is I-4 WB Ramp N2 over I-4 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does I-4 WB Ramp N2 over I-4 carry?
About 5,400 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is I-4 WB Ramp N2 over I-4?
The structure is 811 ft (247.1 m) long with a longest span of 239 ft (72.9 m) and a deck 44 ft wide.
Who owns I-4 WB Ramp N2 over I-4?
It is owned by the State Highway Agency.