US Bridges

SR 417 SB 38.5 over Paved Multi-Use Trail

Good

Seminole County, Florida · 0.4 MI North of SR 426 · Structure no. 770051

Built
1994
31 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
71 ft
1 main span
Daily traffic
31,250
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR 417 SB 38.5 over Paved Multi-Use Trail is a prestressed concrete stringer/multi-beam or girder carrying SR 417 SB 38.5 over Paved Multi-Use Trail in Seminole County, Florida. It was built in 1994, so it is 31 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 31,250 vehicles a day, roughly 11% of them trucks, projected to reach 54,219 by 2044. The structure is 71 ft (21.6 m) long and 51 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSR 417 SB 38.5
CrossesPaved Multi-Use Trail
Location0.4 MI North of SR 426
RouteState Highway 417
StateFlorida
Coordinates28.62316, -81.25744
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating61.6 US tons
Inventory rating51.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length71 ft (21.6 m)
Longest span71 ft (21.6 m)
Deck width51 ft (15.5 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic31,250 (2022)
Projected traffic54,219 by 2044
Trucks11%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesPedestrian / bicycle
Detour if closed0.6 mi (1 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 417 SB 38.5 over Paved Multi-Use Trail built?

It was built in 1994, making it 31 years old in 2025.

What condition is SR 417 SB 38.5 over Paved Multi-Use Trail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does SR 417 SB 38.5 over Paved Multi-Use Trail carry?

About 31,250 vehicles per day (2022 count), of which roughly 11% are trucks.

How long is SR 417 SB 38.5 over Paved Multi-Use Trail?

The structure is 71 ft (21.6 m) long with a longest span of 71 ft (21.6 m) and a deck 51 ft wide.

Who owns SR 417 SB 38.5 over Paved Multi-Use Trail?

It is owned by the State Toll Authority.