S. Salford Blvd over Cocoplum Waterway
FairSarasota County, Florida · 0.1 MI North of US-41 · Structure no. 175006
- Built
- 1969
- 56 years old
- Condition
- Fair
- inspected September 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 154 ft
- 5 main spans
- Daily traffic
- 5,000
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
S. Salford Blvd over Cocoplum Waterway is a prestressed concrete slab carrying S. Salford Blvd over Cocoplum Waterway in Sarasota County, Florida. It was built in 1969, so it is 56 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,000 vehicles a day, roughly 4% of them trucks, projected to reach 8,675 by 2042. The structure is 154 ft (47 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S. Salford Blvd over Cocoplum Waterway built?
It was built in 1969, making it 56 years old in 2025.
What condition is S. Salford Blvd over Cocoplum Waterway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does S. Salford Blvd over Cocoplum Waterway carry?
About 5,000 vehicles per day (2021 count), of which roughly 4% are trucks.
How long is S. Salford Blvd over Cocoplum Waterway?
The structure is 154 ft (47 m) long with a longest span of 31 ft (9.4 m) and a deck 30 ft wide.
Who owns S. Salford Blvd over Cocoplum Waterway?
It is owned by the City or Municipal Highway Agency.