US Bridges

I-75 (SR-93) SB over Sumter Blvd.

Good

Sarasota County, Florida · 10.9 MI N of Charlotte Cl · Structure no. 170129

Built
1981
44 years old, rebuilt 2004
Condition
Good
inspected January 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
177 ft
3 main spans
Daily traffic
31,250
2025 count
Owner
State
State Highway Agency

About this bridge

I-75 (SR-93) SB over Sumter Blvd. is a prestressed concrete stringer/multi-beam or girder carrying I-75 (SR-93) SB over Sumter Blvd. in Sarasota County, Florida. It was built in 1981 and reconstructed in 2004, so it is 44 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 31,250 vehicles a day, roughly 14% of them trucks, projected to reach 54,219 by 2045. The structure is 177 ft (53.9 m) long and 59 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-75 (SR-93) SB
CrossesSumter Blvd.
Location10.9 MI N of Charlotte Cl
RouteInterstate 75
StateFlorida
Coordinates27.09911, -82.20329
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.1 US tons
Inventory rating31.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length177 ft (53.9 m)
Longest span103 ft (31.5 m)
Deck width59 ft (18 m)
Roadway width56 ft (17 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic31,250 (2025)
Projected traffic54,219 by 2045
Trucks14%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-75 (SR-93) SB over Sumter Blvd. built?

It was built in 1981, making it 44 years old in 2025. It was reconstructed in 2004.

What condition is I-75 (SR-93) SB over Sumter Blvd. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does I-75 (SR-93) SB over Sumter Blvd. carry?

About 31,250 vehicles per day (2025 count), of which roughly 14% are trucks.

How long is I-75 (SR-93) SB over Sumter Blvd.?

The structure is 177 ft (53.9 m) long with a longest span of 103 ft (31.5 m) and a deck 59 ft wide.

Who owns I-75 (SR-93) SB over Sumter Blvd.?

It is owned by the State Highway Agency.