I-75 SB over Palmer Blvd.
FairSarasota County, Florida · 0.9 MI South of SR-780 · Structure no. 170081
- Built
- 1979
- 46 years old
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 136 ft
- 3 main spans
- Daily traffic
- 127,000
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-75 SB over Palmer Blvd. is a prestressed concrete stringer/multi-beam or girder carrying I-75 SB over Palmer Blvd. in Sarasota County, Florida. It was built in 1979, so it is 46 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 127,000 vehicles a day, roughly 12% of them trucks, projected to reach 220,345 by 2044. The structure is 136 ft (41.5 m) long and 59 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-75 SB over Palmer Blvd. built?
It was built in 1979, making it 46 years old in 2025.
What condition is I-75 SB over Palmer Blvd. in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does I-75 SB over Palmer Blvd. carry?
About 127,000 vehicles per day (2024 count), of which roughly 12% are trucks.
How long is I-75 SB over Palmer Blvd.?
The structure is 136 ft (41.5 m) long with a longest span of 60 ft (18.3 m) and a deck 59 ft wide.
Who owns I-75 SB over Palmer Blvd.?
It is owned by the State Highway Agency.