US Bridges

SR-758 over Grand Canal

Fair

Sarasota County, Florida · 3.1 MI West of US-41 · Structure no. 170059

Built
1966
59 years old
Condition
Fair
inspected January 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
90 ft
3 main spans
Daily traffic
7,600
2025 count
Owner
County
County Highway Agency

About this bridge

SR-758 over Grand Canal is a prestressed concrete stringer/multi-beam or girder carrying SR-758 over Grand Canal in Sarasota County, Florida. It was built in 1966, so it is 59 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,600 vehicles a day, roughly 4% of them trucks, projected to reach 13,186 by 2045. The structure is 90 ft (27.4 m) long and 34 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR-758
CrossesGrand Canal
Location3.1 MI West of US-41
RouteState Highway 758
StateFlorida
Coordinates27.28497, -82.55528
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.4 US tons
Inventory rating35.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadH 20
Structure length90 ft (27.4 m)
Longest span50 ft (15.2 m)
Deck width34 ft (10.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,600 (2025)
Projected traffic13,186 by 2045
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR-758 over Grand Canal built?

It was built in 1966, making it 59 years old in 2025.

What condition is SR-758 over Grand Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does SR-758 over Grand Canal carry?

About 7,600 vehicles per day (2025 count), of which roughly 4% are trucks.

How long is SR-758 over Grand Canal?

The structure is 90 ft (27.4 m) long with a longest span of 50 ft (15.2 m) and a deck 34 ft wide.

Who owns SR-758 over Grand Canal?

It is owned by the County Highway Agency.