NB I-95 (SR-9) over Galiano RD & C-24 Canal
GoodSt. Lucie County, Florida · 2 Mi. N of Gatlin Blvd. · Structure no. 940114
- Built
- 1982
- 43 years old, rebuilt 2008
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 416 ft
- 6 main spans
- Daily traffic
- 49,750
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
NB I-95 (SR-9) over Galiano RD & C-24 Canal is a prestressed concrete stringer/multi-beam or girder carrying NB I-95 (SR-9) over Galiano RD & C-24 Canal in St. Lucie County, Florida. It was built in 1982 and reconstructed in 2008, so it is 43 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 49,750 vehicles a day, roughly 11% of them trucks, projected to reach 86,317 by 2045. The structure is 416 ft (126.8 m) long and 59 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NB I-95 (SR-9) over Galiano RD & C-24 Canal built?
It was built in 1982, making it 43 years old in 2025. It was reconstructed in 2008.
What condition is NB I-95 (SR-9) over Galiano RD & C-24 Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does NB I-95 (SR-9) over Galiano RD & C-24 Canal carry?
About 49,750 vehicles per day (2023 count), of which roughly 11% are trucks.
How long is NB I-95 (SR-9) over Galiano RD & C-24 Canal?
The structure is 416 ft (126.8 m) long with a longest span of 85 ft (25.8 m) and a deck 59 ft wide.
Who owns NB I-95 (SR-9) over Galiano RD & C-24 Canal?
It is owned by the State Highway Agency.