SR-A1A over Fpl Nuc Plant Intake Cnl
FairSt. Lucie County, Florida · 6.5 MI North of SR-732 · Structure no. 940084
- Built
- 1974
- 51 years old, rebuilt 2009
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 280 ft
- 4 main spans
- Daily traffic
- 3,800
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR-A1A over Fpl Nuc Plant Intake Cnl is a prestressed concrete stringer/multi-beam or girder carrying SR-A1A over Fpl Nuc Plant Intake Cnl in St. Lucie County, Florida. It was built in 1974 and reconstructed in 2009, so it is 51 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,800 vehicles a day, roughly 6% of them trucks, projected to reach 6,593 by 2044. The structure is 280 ft (85.3 m) long and 46 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-A1A over Fpl Nuc Plant Intake Cnl built?
It was built in 1974, making it 51 years old in 2025. It was reconstructed in 2009.
What condition is SR-A1A over Fpl Nuc Plant Intake Cnl in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does SR-A1A over Fpl Nuc Plant Intake Cnl carry?
About 3,800 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is SR-A1A over Fpl Nuc Plant Intake Cnl?
The structure is 280 ft (85.3 m) long with a longest span of 70 ft (21.3 m) and a deck 46 ft wide.
Who owns SR-A1A over Fpl Nuc Plant Intake Cnl?
It is owned by the State Highway Agency.