US Bridges

W Tocoi RD over Trib to Cedar Creek

Good

Putnam County, Florida · 2.2 MI N of CR 209 · Structure no. 764053

Built
2007
18 years old
Condition
Good
inspected November 2023
Type
Culvert
Concrete
Length
46 ft
3 main spans
Daily traffic
721
2023 count
Owner
County
County Highway Agency

About this bridge

W Tocoi RD over Trib to Cedar Creek is a concrete culvert carrying W Tocoi RD over Trib to Cedar Creek in Putnam County, Florida. It was built in 2007, so it is 18 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 721 vehicles a day, roughly 5% of them trucks, projected to reach 1,251 by 2042. The structure is 46 ft (13.9 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesW Tocoi RD
CrossesTrib to Cedar Creek
Location2.2 MI N of CR 209
RouteCounty Highway 209
StateFlorida
Coordinates29.80372, -81.62647
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 18 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46 US tons
Inventory rating35.5 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length46 ft (13.9 m)
Longest span14 ft (4.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic721 (2023)
Projected traffic1,251 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was W Tocoi RD over Trib to Cedar Creek built?

It was built in 2007, making it 18 years old in 2025.

What condition is W Tocoi RD over Trib to Cedar Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does W Tocoi RD over Trib to Cedar Creek carry?

About 721 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is W Tocoi RD over Trib to Cedar Creek?

The structure is 46 ft (13.9 m) long with a longest span of 14 ft (4.3 m).

Who owns W Tocoi RD over Trib to Cedar Creek?

It is owned by the County Highway Agency.