Ewell Road over Poley Creek
GoodPolk County, Florida · 2.9 MI E/O County Line RD · Structure no. 164554
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected October 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 59 ft
- 1 main span
- Daily traffic
- 9,400
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Ewell Road over Poley Creek is a prestressed concrete slab carrying Ewell Road over Poley Creek in Polk County, Florida. It was built in 2018, so it is 7 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,400 vehicles a day, roughly 12% of them trucks, projected to reach 16,309 by 2044. The structure is 59 ft (18 m) long and 37 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ewell Road over Poley Creek built?
It was built in 2018, making it 7 years old in 2025.
What condition is Ewell Road over Poley Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Ewell Road over Poley Creek carry?
About 9,400 vehicles per day (2024 count), of which roughly 12% are trucks.
How long is Ewell Road over Poley Creek?
The structure is 59 ft (18 m) long with a longest span of 59 ft (18 m) and a deck 37 ft wide.
Who owns Ewell Road over Poley Creek?
It is owned by the County Highway Agency.