US Bridges

SR 570 WB 18.6 over CR 546

Good

Polk County, Florida · 5.7MI W of I-4 · Structure no. 164511

Built
2023
2 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
161 ft
2 main spans
Daily traffic
11,500
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR 570 WB 18.6 over CR 546 is a prestressed concrete stringer/multi-beam or girder carrying SR 570 WB 18.6 over CR 546 in Polk County, Florida. It was built in 2023, so it is 2 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,500 vehicles a day, roughly 14% of them trucks, projected to reach 19,952 by 2042. The structure is 161 ft (49.1 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR 570 WB 18.6
CrossesCR 546
Location5.7MI W of I-4
RouteState Highway 570
StateFlorida
Coordinates28.07352, -81.83281
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating76.3 US tons
Inventory rating52.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length161 ft (49.1 m)
Longest span80 ft (24.4 m)
Deck width44 ft (13.3 m)
Roadway width41 ft (12.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,500 (2022)
Projected traffic19,952 by 2042
Trucks14%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 570 WB 18.6 over CR 546 built?

It was built in 2023, making it 2 years old in 2025.

What condition is SR 570 WB 18.6 over CR 546 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does SR 570 WB 18.6 over CR 546 carry?

About 11,500 vehicles per day (2022 count), of which roughly 14% are trucks.

How long is SR 570 WB 18.6 over CR 546?

The structure is 161 ft (49.1 m) long with a longest span of 80 ft (24.4 m) and a deck 44 ft wide.

Who owns SR 570 WB 18.6 over CR 546?

It is owned by the State Toll Authority.