US Bridges

W Lake Wales Altur over Peace Creek Drain

FairPosted for load

Polk County, Florida · 1.0MI West of Crews RD · Structure no. 164321

Built
1960
65 years old
Condition
Fair
inspected June 2023
Type
Channel Beam
Prestressed Concrete
Length
26 ft
1 main span
Daily traffic
135
2023 count
Owner
County
County Highway Agency

About this bridge

W Lake Wales Altur over Peace Creek Drain is a prestressed concrete channel beam carrying W Lake Wales Altur over Peace Creek Drain in Polk County, Florida. It was built in 1960, so it is 65 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 135 vehicles a day, roughly 5% of them trucks, projected to reach 234 by 2042. The structure is 26 ft (7.9 m) long and 24 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesW Lake Wales Altur
CrossesPeace Creek Drain
Location1.0MI West of Crews RD
RouteCounty Highway 0
StateFlorida
Coordinates27.87673, -81.65616
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36.4 US tons
Inventory rating21.6 US tons

Structure

Structure typeChannel Beam
MaterialPrestressed Concrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length26 ft (7.9 m)
Longest span26 ft (7.9 m)
Deck width24 ft (7.3 m)
Roadway width21 ft (6.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic135 (2023)
Projected traffic234 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was W Lake Wales Altur over Peace Creek Drain built?

It was built in 1960, making it 65 years old in 2025.

What condition is W Lake Wales Altur over Peace Creek Drain in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does W Lake Wales Altur over Peace Creek Drain carry?

About 135 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is W Lake Wales Altur over Peace Creek Drain?

The structure is 26 ft (7.9 m) long with a longest span of 26 ft (7.9 m) and a deck 24 ft wide.

Who owns W Lake Wales Altur over Peace Creek Drain?

It is owned by the County Highway Agency.