S Frontage RD 5.0 over Csxrr Beaker&wilkinsonrd
GoodPolk County, Florida · 0.4MI W of Harden Blvd · Structure no. 160249
- Built
- 1998
- 27 years old
- Condition
- Good
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 333 ft
- 2 main spans
- Daily traffic
- 8,600
- 2022 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
S Frontage RD 5.0 over Csxrr Beaker&wilkinsonrd is a steel continuous stringer/multi-beam or girder carrying S Frontage RD 5.0 over Csxrr Beaker&wilkinsonrd in Polk County, Florida. It was built in 1998, so it is 27 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 8,600 vehicles a day, roughly 5% of them trucks, projected to reach 14,921 by 2044. The structure is 333 ft (101.5 m) long and 52 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S Frontage RD 5.0 over Csxrr Beaker&wilkinsonrd built?
It was built in 1998, making it 27 years old in 2025.
What condition is S Frontage RD 5.0 over Csxrr Beaker&wilkinsonrd in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does S Frontage RD 5.0 over Csxrr Beaker&wilkinsonrd carry?
About 8,600 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is S Frontage RD 5.0 over Csxrr Beaker&wilkinsonrd?
The structure is 333 ft (101.5 m) long with a longest span of 198 ft (60.3 m) and a deck 52 ft wide.
Who owns S Frontage RD 5.0 over Csxrr Beaker&wilkinsonrd?
It is owned by the State Toll Authority.