US Bridges

SR570 Polk Rmp 0.1 over S Frontage Road

Good

Polk County, Florida · Ramp I-4 EB to SR 570 EB · Structure no. 160237

Built
1998
27 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
88 ft
1 main span
Daily traffic
10,500
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR570 Polk Rmp 0.1 over S Frontage Road is a prestressed concrete stringer/multi-beam or girder carrying SR570 Polk Rmp 0.1 over S Frontage Road in Polk County, Florida. It was built in 1998, so it is 27 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,500 vehicles a day, roughly 15% of them trucks, projected to reach 18,218 by 2044. The structure is 88 ft (26.7 m) long and 46 ft wide.

CarriesSR570 Polk Rmp 0.1
CrossesS Frontage Road
LocationRamp I-4 EB to SR 570 EB
RouteState Highway 570
StateFlorida
Coordinates28.03498, -82.04091
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.7 US tons
Inventory rating41.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length88 ft (26.7 m)
Longest span88 ft (26.7 m)
Deck width46 ft (14.1 m)
Roadway width43 ft (13.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,500 (2022)
Projected traffic18,218 by 2044
Trucks15%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR570 Polk Rmp 0.1 over S Frontage Road built?

It was built in 1998, making it 27 years old in 2025.

What condition is SR570 Polk Rmp 0.1 over S Frontage Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does SR570 Polk Rmp 0.1 over S Frontage Road carry?

About 10,500 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is SR570 Polk Rmp 0.1 over S Frontage Road?

The structure is 88 ft (26.7 m) long with a longest span of 88 ft (26.7 m) and a deck 46 ft wide.

Who owns SR570 Polk Rmp 0.1 over S Frontage Road?

It is owned by the State Toll Authority.