SR-60 WB over Peace Creek Drain Canal
GoodPolk County, Florida · 1.7 MI East of CR-655 · Structure no. 160221
- Built
- 2001
- 24 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 235 ft
- 3 main spans
- Daily traffic
- 13,000
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR-60 WB over Peace Creek Drain Canal is a prestressed concrete stringer/multi-beam or girder carrying SR-60 WB over Peace Creek Drain Canal in Polk County, Florida. It was built in 2001, so it is 24 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 13,000 vehicles a day, roughly 20% of them trucks, projected to reach 22,555 by 2044. The structure is 235 ft (71.6 m) long and 46 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-60 WB over Peace Creek Drain Canal built?
It was built in 2001, making it 24 years old in 2025.
What condition is SR-60 WB over Peace Creek Drain Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does SR-60 WB over Peace Creek Drain Canal carry?
About 13,000 vehicles per day (2024 count), of which roughly 20% are trucks.
How long is SR-60 WB over Peace Creek Drain Canal?
The structure is 235 ft (71.6 m) long with a longest span of 78 ft (23.9 m) and a deck 46 ft wide.
Who owns SR-60 WB over Peace Creek Drain Canal?
It is owned by the State Highway Agency.