US Bridges

SR-33 over Pit Creek

Fair

Polk County, Florida · 0.3MI S of 1-4 (SR-400) · Structure no. 160143

Built
1940
85 years old, rebuilt 1977
Condition
Fair
inspected May 2023
Type
Culvert
Concrete
Length
21 ft
2 main spans
Daily traffic
13,000
2022 count
Owner
State
State Highway Agency

About this bridge

SR-33 over Pit Creek is a concrete culvert carrying SR-33 over Pit Creek in Polk County, Florida. It was built in 1940 and reconstructed in 1977, so it is 85 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 13,000 vehicles a day, roughly 17% of them trucks, projected to reach 22,555 by 2044. The structure is 21 ft (6.3 m) long. If it were closed, the detour would be 4.3 mi (7 km).

CarriesSR-33
CrossesPit Creek
Location0.3MI S of 1-4 (SR-400)
RouteState Highway 33
StateFlorida
Coordinates28.13609, -81.90044
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating83.4 US tons
Inventory rating50 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadH 15
Structure length21 ft (6.3 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,000 (2022)
Projected traffic22,555 by 2044
Trucks17%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed4.3 mi (7 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR-33 over Pit Creek built?

It was built in 1940, making it 85 years old in 2025. It was reconstructed in 1977.

What condition is SR-33 over Pit Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does SR-33 over Pit Creek carry?

About 13,000 vehicles per day (2022 count), of which roughly 17% are trucks.

How long is SR-33 over Pit Creek?

The structure is 21 ft (6.3 m) long with a longest span of 10 ft (3 m).

Who owns SR-33 over Pit Creek?

It is owned by the State Highway Agency.