US Bridges

West Lot Entrance over Harrisons Canal

Good

Pinellas County, Florida · 50FT E/O New York Ave · Structure no. 156711

Built
2003
22 years old
Condition
Good
inspected August 2024
Type
Arch - Deck
Concrete
Length
32 ft
1 main span
Daily traffic
10
2024 count
Owner
Local
Other Local Agency

About this bridge

West Lot Entrance over Harrisons Canal is a concrete arch - deck carrying West Lot Entrance over Harrisons Canal in Pinellas County, Florida. It was built in 2003, so it is 22 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10 vehicles a day, projected to reach 17 by 2044. The structure is 32 ft (9.8 m) long and 48 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesWest Lot Entrance
CrossesHarrisons Canal
Location50FT E/O New York Ave
RouteCity Street 0
StateFlorida
Coordinates28.00009, -82.77949
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating62.4 US tons
Inventory rating48.1 US tons

Structure

Structure typeArch - Deck
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length32 ft (9.8 m)
Longest span32 ft (9.8 m)
Deck width48 ft (14.6 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic10 (2024)
Projected traffic17 by 2044
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was West Lot Entrance over Harrisons Canal built?

It was built in 2003, making it 22 years old in 2025.

What condition is West Lot Entrance over Harrisons Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does West Lot Entrance over Harrisons Canal carry?

About 10 vehicles per day (2024 count).

How long is West Lot Entrance over Harrisons Canal?

The structure is 32 ft (9.8 m) long with a longest span of 32 ft (9.8 m) and a deck 48 ft wide.

Who owns West Lot Entrance over Harrisons Canal?

It is owned by the Other Local Agency.