US Bridges

Alt US-19 (SR-595) over Pinellas Trail

Good

Pinellas County, Florida · 3.0MI. N of CR-752 · Structure no. 150233

Built
1996
29 years old
Condition
Good
inspected February 2024
Type
Culvert
Concrete
Length
33 ft
1 main span
Daily traffic
17,300
2024 count
Owner
State
State Highway Agency

About this bridge

Alt US-19 (SR-595) over Pinellas Trail is a concrete culvert carrying Alt US-19 (SR-595) over Pinellas Trail in Pinellas County, Florida. It was built in 1996, so it is 29 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 17,300 vehicles a day, roughly 6% of them trucks, projected to reach 21,625 by 2044. The structure is 33 ft (10 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesAlt US-19 (SR-595)
CrossesPinellas Trail
Location3.0MI. N of CR-752
RouteU.S. Route 19
StateFlorida
Coordinates28.10968, -82.7686
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating75.5 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20 + Mod
Structure length33 ft (10 m)
Longest span33 ft (10 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,300 (2024)
Projected traffic21,625 by 2044
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesPedestrian / bicycle
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Alt US-19 (SR-595) over Pinellas Trail built?

It was built in 1996, making it 29 years old in 2025.

What condition is Alt US-19 (SR-595) over Pinellas Trail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Alt US-19 (SR-595) over Pinellas Trail carry?

About 17,300 vehicles per day (2024 count), of which roughly 6% are trucks.

How long is Alt US-19 (SR-595) over Pinellas Trail?

The structure is 33 ft (10 m) long with a longest span of 33 ft (10 m).

Who owns Alt US-19 (SR-595) over Pinellas Trail?

It is owned by the State Highway Agency.