US Bridges

I-275SB/US-19/SR93 over North Rest Area Entrance

Good

Pinellas County, Florida · 1MI N of Skyway Bridge · Structure no. 150215

Built
1989
36 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
78 ft
1 main span
Daily traffic
32,608
2022 count
Owner
State
State Highway Agency

About this bridge

I-275SB/US-19/SR93 over North Rest Area Entrance is a prestressed concrete stringer/multi-beam or girder carrying I-275SB/US-19/SR93 over North Rest Area Entrance in Pinellas County, Florida. It was built in 1989, so it is 36 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 32,608 vehicles a day, roughly 7% of them trucks, projected to reach 56,574 by 2044. The structure is 78 ft (23.8 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-275SB/US-19/SR93
CrossesNorth Rest Area Entrance
Location1MI N of Skyway Bridge
RouteInterstate 275
StateFlorida
Coordinates27.64982, -82.6755
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71 US tons
Inventory rating64 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length78 ft (23.8 m)
Longest span78 ft (23.8 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic32,608 (2022)
Projected traffic56,574 by 2044
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn an Interstate toll segment under Secretarial agreement
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-275SB/US-19/SR93 over North Rest Area Entrance built?

It was built in 1989, making it 36 years old in 2025.

What condition is I-275SB/US-19/SR93 over North Rest Area Entrance in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does I-275SB/US-19/SR93 over North Rest Area Entrance carry?

About 32,608 vehicles per day (2022 count), of which roughly 7% are trucks.

How long is I-275SB/US-19/SR93 over North Rest Area Entrance?

The structure is 78 ft (23.8 m) long with a longest span of 78 ft (23.8 m) and a deck 43 ft wide.

Who owns I-275SB/US-19/SR93 over North Rest Area Entrance?

It is owned by the State Highway Agency.