CR77 (rowan RD Nb) over Pithlachascotee River
GoodPasco County, Florida · 0.1MI. S of Plathe Road · Structure no. 144025
- Built
- 1978
- 47 years old, rebuilt 1999
- Condition
- Good
- inspected February 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 110 ft
- 3 main spans
- Daily traffic
- 22,000
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
CR77 (rowan RD Nb) over Pithlachascotee River is a prestressed concrete slab carrying CR77 (rowan RD Nb) over Pithlachascotee River in Pasco County, Florida. It was built in 1978 and reconstructed in 1999, so it is 47 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 22,000 vehicles a day, roughly 13% of them trucks, projected to reach 38,170 by 2042. The structure is 110 ft (33.4 m) long and 48 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR77 (rowan RD Nb) over Pithlachascotee River built?
It was built in 1978, making it 47 years old in 2025. It was reconstructed in 1999.
What condition is CR77 (rowan RD Nb) over Pithlachascotee River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does CR77 (rowan RD Nb) over Pithlachascotee River carry?
About 22,000 vehicles per day (2024 count), of which roughly 13% are trucks.
How long is CR77 (rowan RD Nb) over Pithlachascotee River?
The structure is 110 ft (33.4 m) long with a longest span of 42 ft (12.8 m) and a deck 48 ft wide.
Who owns CR77 (rowan RD Nb) over Pithlachascotee River?
It is owned by the County Highway Agency.