US Bridges

Okeelanta / CR827A over N. New River Canal

Good

Palm Beach County, Florida · At US-27 · Structure no. 934522

Built
1999
26 years old
Condition
Good
inspected January 2024
Type
Slab
Prestressed Concrete
Length
110 ft
3 main spans
Daily traffic
600
2024 count
Owner
County
County Highway Agency

About this bridge

Okeelanta / CR827A over N. New River Canal is a prestressed concrete slab carrying Okeelanta / CR827A over N. New River Canal in Palm Beach County, Florida. It was built in 1999, so it is 26 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 600 vehicles a day, roughly 30% of them trucks, projected to reach 800 by 2042. The structure is 110 ft (33.5 m) long and 46 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesOkeelanta / CR827A
CrossesN. New River Canal
LocationAt US-27
RouteCounty Highway 827
StateFlorida
Coordinates26.61, -80.71115
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating59.9 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 25 or greater
Structure length110 ft (33.5 m)
Longest span37 ft (11.2 m)
Deck width46 ft (13.9 m)
Roadway width41 ft (12.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic600 (2024)
Projected traffic800 by 2042
Trucks30%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Okeelanta / CR827A over N. New River Canal built?

It was built in 1999, making it 26 years old in 2025.

What condition is Okeelanta / CR827A over N. New River Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Okeelanta / CR827A over N. New River Canal carry?

About 600 vehicles per day (2024 count), of which roughly 30% are trucks.

How long is Okeelanta / CR827A over N. New River Canal?

The structure is 110 ft (33.5 m) long with a longest span of 37 ft (11.2 m) and a deck 46 ft wide.

Who owns Okeelanta / CR827A over N. New River Canal?

It is owned by the County Highway Agency.