US Bridges

Stribling Way over E-1 Canal

Good

Palm Beach County, Florida · Striblingway Ovr E-1CANAL · Structure no. 934301

Built
2002
23 years old
Condition
Good
inspected March 2023
Type
Slab
Prestressed Concrete
Length
35 ft
1 main span
Daily traffic
5,500
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Stribling Way over E-1 Canal is a prestressed concrete slab carrying Stribling Way over E-1 Canal in Palm Beach County, Florida. It was built in 2002, so it is 23 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,500 vehicles a day, projected to reach 5,500 by 2042. The structure is 35 ft (10.7 m) long and 93 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesStribling Way
CrossesE-1 Canal
LocationStriblingway Ovr E-1CANAL
RouteCity Street 0
StateFlorida
Coordinates26.63594, -80.20367
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.7 US tons
Inventory rating37.8 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadUnknown
Structure length35 ft (10.7 m)
Longest span35 ft (10.7 m)
Deck width93 ft (28.2 m)
Roadway width73 ft (22.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,500 (2023)
Projected traffic5,500 by 2042
Trucks—
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Stribling Way over E-1 Canal built?

It was built in 2002, making it 23 years old in 2025.

What condition is Stribling Way over E-1 Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Stribling Way over E-1 Canal carry?

About 5,500 vehicles per day (2023 count).

How long is Stribling Way over E-1 Canal?

The structure is 35 ft (10.7 m) long with a longest span of 35 ft (10.7 m) and a deck 93 ft wide.

Who owns Stribling Way over E-1 Canal?

It is owned by the Town or Township Highway Agency.