US Bridges

Crestwood Blvd. over Itcwd Canal 3

Good

Palm Beach County, Florida · 1.2MI S of Okeechobee Bl · Structure no. 934291

Built
1998
27 years old
Condition
Good
inspected January 2024
Type
Slab
Prestressed Concrete
Length
70 ft
2 main spans
Daily traffic
17,500
2024 count
Owner
County
County Highway Agency

About this bridge

Crestwood Blvd. over Itcwd Canal 3 is a prestressed concrete slab carrying Crestwood Blvd. over Itcwd Canal 3 in Palm Beach County, Florida. It was built in 1998, so it is 27 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 17,500 vehicles a day, roughly 2% of them trucks, projected to reach 30,362 by 2042. The structure is 70 ft (21.3 m) long and 95 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCrestwood Blvd.
CrossesItcwd Canal 3
Location1.2MI S of Okeechobee Bl
RouteCounty Highway 0
StateFlorida
Coordinates26.69055, -80.2447
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating62.6 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2
Design loadHS 25 or greater
Structure length70 ft (21.3 m)
Longest span35 ft (10.7 m)
Deck width95 ft (29 m)
Roadway width62 ft (18.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,500 (2024)
Projected traffic30,362 by 2042
Trucks2%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Crestwood Blvd. over Itcwd Canal 3 built?

It was built in 1998, making it 27 years old in 2025.

What condition is Crestwood Blvd. over Itcwd Canal 3 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Crestwood Blvd. over Itcwd Canal 3 carry?

About 17,500 vehicles per day (2024 count), of which roughly 2% are trucks.

How long is Crestwood Blvd. over Itcwd Canal 3?

The structure is 70 ft (21.3 m) long with a longest span of 35 ft (10.7 m) and a deck 95 ft wide.

Who owns Crestwood Blvd. over Itcwd Canal 3?

It is owned by the County Highway Agency.