Summit Blvd over Lwdd E-3 Canal
GoodPalm Beach County, Florida · 0.4MI W of Haverhill Blvd · Structure no. 934228
- Built
- 1992
- 33 years old
- Condition
- Good
- inspected March 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 67 ft
- 3 main spans
- Daily traffic
- 11,900
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Summit Blvd over Lwdd E-3 Canal is a prestressed concrete slab carrying Summit Blvd over Lwdd E-3 Canal in Palm Beach County, Florida. It was built in 1992, so it is 33 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,900 vehicles a day, roughly 3% of them trucks, projected to reach 20,647 by 2044. The structure is 67 ft (20.3 m) long and 81 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Summit Blvd over Lwdd E-3 Canal built?
It was built in 1992, making it 33 years old in 2025.
What condition is Summit Blvd over Lwdd E-3 Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does Summit Blvd over Lwdd E-3 Canal carry?
About 11,900 vehicles per day (2024 count), of which roughly 3% are trucks.
How long is Summit Blvd over Lwdd E-3 Canal?
The structure is 67 ft (20.3 m) long with a longest span of 35 ft (10.7 m) and a deck 81 ft wide.
Who owns Summit Blvd over Lwdd E-3 Canal?
It is owned by the County Highway Agency.