US Bridges

Investment Lane over I-95

Good

Palm Beach County, Florida · 0.5 E of Military Trail · Structure no. 934162

Built
2003
22 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
393 ft
3 main spans
Daily traffic
7,400
2024 count
Owner
County
County Highway Agency

About this bridge

Investment Lane over I-95 is a prestressed concrete stringer/multi-beam or girder carrying Investment Lane over I-95 in Palm Beach County, Florida. It was built in 2003, so it is 22 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,400 vehicles a day, roughly 7% of them trucks, projected to reach 12,839 by 2044. The structure is 393 ft (119.9 m) long and 45 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesInvestment Lane
CrossesI-95
Location0.5 E of Military Trail
RouteCounty Highway 0
StateFlorida
Coordinates26.7979, -80.09866
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating110.1 US tons
Inventory rating70.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length393 ft (119.9 m)
Longest span150 ft (45.8 m)
Deck width45 ft (13.7 m)
Roadway width35 ft (10.8 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic7,400 (2024)
Projected traffic12,839 by 2044
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Investment Lane over I-95 built?

It was built in 2003, making it 22 years old in 2025.

What condition is Investment Lane over I-95 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Investment Lane over I-95 carry?

About 7,400 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is Investment Lane over I-95?

The structure is 393 ft (119.9 m) long with a longest span of 150 ft (45.8 m) and a deck 45 ft wide.

Who owns Investment Lane over I-95?

It is owned by the County Highway Agency.