US Bridges

SR80 Southern Blvd over Icww

Good

Palm Beach County, Florida · 1.3 MI East of I-95 · Structure no. 930559

Built
2022
3 years old
Condition
Good
inspected February 2024
Type
Movable - Bascule
Steel
Length
948 ft
1 main span
Daily traffic
13,700
2024 count
Owner
State
State Highway Agency

About this bridge

SR80 Southern Blvd over Icww is a steel movable - bascule carrying SR80 Southern Blvd over Icww in Palm Beach County, Florida. It was built in 2022, so it is 3 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,700 vehicles a day, roughly 3% of them trucks, projected to reach 17,400 by 2042. The structure is 948 ft (289 m) long and 61 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesSR80 Southern Blvd
CrossesIcww
Location1.3 MI East of I-95
RouteU.S. Route 98
StateFlorida
Coordinates26.67539, -80.04683
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.4 US tons
Inventory rating41 US tons

Structure

Structure typeMovable - Bascule
MaterialSteel
DeckClosed grating
Main spans1 (+10 approach)
Design loadHL 93
Structure length948 ft (289 m)
Longest span228 ft (69.5 m)
Deck width61 ft (18.7 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deck17 ft (5.2 m)

Traffic and service

Average daily traffic13,700 (2024)
Projected traffic17,400 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR80 Southern Blvd over Icww built?

It was built in 2022, making it 3 years old in 2025.

What condition is SR80 Southern Blvd over Icww in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does SR80 Southern Blvd over Icww carry?

About 13,700 vehicles per day (2024 count), of which roughly 3% are trucks.

How long is SR80 Southern Blvd over Icww?

The structure is 948 ft (289 m) long with a longest span of 228 ft (69.5 m) and a deck 61 ft wide.

Who owns SR80 Southern Blvd over Icww?

It is owned by the State Highway Agency.