US Bridges

6 Ave S to NB I-95 over Lake Worth Util Outfall

Good

Palm Beach County, Florida · 0.38 Mi. S of SR-802 · Structure no. 930511

Built
2007
18 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
262 ft
3 main spans
Daily traffic
10,500
2023 count
Owner
State
State Highway Agency

About this bridge

6 Ave S to NB I-95 over Lake Worth Util Outfall is a prestressed concrete stringer/multi-beam or girder carrying 6 Ave S to NB I-95 over Lake Worth Util Outfall in Palm Beach County, Florida. It was built in 2007, so it is 18 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,500 vehicles a day, roughly 5% of them trucks, projected to reach 18,218 by 2042. The structure is 262 ft (79.8 m) long and 43 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

Carries6 Ave S to NB I-95
CrossesLake Worth Util Outfall
Location0.38 Mi. S of SR-802
RouteInterstate 95
StateFlorida
Coordinates26.61108, -80.06836
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.4 US tons
Inventory rating39.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length262 ft (79.8 m)
Longest span105 ft (32 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,500 (2023)
Projected traffic18,218 by 2042
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 6 Ave S to NB I-95 over Lake Worth Util Outfall built?

It was built in 2007, making it 18 years old in 2025.

What condition is 6 Ave S to NB I-95 over Lake Worth Util Outfall in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does 6 Ave S to NB I-95 over Lake Worth Util Outfall carry?

About 10,500 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is 6 Ave S to NB I-95 over Lake Worth Util Outfall?

The structure is 262 ft (79.8 m) long with a longest span of 105 ft (32 m) and a deck 43 ft wide.

Who owns 6 Ave S to NB I-95 over Lake Worth Util Outfall?

It is owned by the State Highway Agency.