NB I-95 (SR-9) over C-51 Canal
GoodPalm Beach County, Florida · 0.6 Mile South of SR-882 · Structure no. 930509
- Built
- 2008
- 17 years old
- Condition
- Good
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 273 ft
- 3 main spans
- Daily traffic
- 112,000
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
NB I-95 (SR-9) over C-51 Canal is a prestressed concrete stringer/multi-beam or girder carrying NB I-95 (SR-9) over C-51 Canal in Palm Beach County, Florida. It was built in 2008, so it is 17 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 112,000 vehicles a day, roughly 5% of them trucks, projected to reach 194,320 by 2042. The structure is 273 ft (83.2 m) long and 103 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NB I-95 (SR-9) over C-51 Canal built?
It was built in 2008, making it 17 years old in 2025.
What condition is NB I-95 (SR-9) over C-51 Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does NB I-95 (SR-9) over C-51 Canal carry?
About 112,000 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is NB I-95 (SR-9) over C-51 Canal?
The structure is 273 ft (83.2 m) long with a longest span of 91 ft (27.7 m) and a deck 103 ft wide.
Who owns NB I-95 (SR-9) over C-51 Canal?
It is owned by the State Highway Agency.