US Bridges

NB I-95 (sr 9) over Lake Ida Road

Good

Palm Beach County, Florida · E Congress Ave & N SR 806 · Structure no. 930495

Built
2004
21 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
126 ft
1 main span
Daily traffic
105,162
2024 count
Owner
State
State Highway Agency

About this bridge

NB I-95 (sr 9) over Lake Ida Road is a prestressed concrete stringer/multi-beam or girder carrying NB I-95 (sr 9) over Lake Ida Road in Palm Beach County, Florida. It was built in 2004, so it is 21 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 105,162 vehicles a day, roughly 8% of them trucks, projected to reach 182,456 by 2044. The structure is 126 ft (38.5 m) long and 91 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesNB I-95 (sr 9)
CrossesLake Ida Road
LocationE Congress Ave & N SR 806
RouteInterstate 95
StateFlorida
Coordinates26.47136, -80.08891
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65.9 US tons
Inventory rating50.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length126 ft (38.5 m)
Longest span126 ft (38.5 m)
Deck width91 ft (27.6 m)
Roadway width88 ft (26.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic105,162 (2024)
Projected traffic182,456 by 2044
Trucks8%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was NB I-95 (sr 9) over Lake Ida Road built?

It was built in 2004, making it 21 years old in 2025.

What condition is NB I-95 (sr 9) over Lake Ida Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does NB I-95 (sr 9) over Lake Ida Road carry?

About 105,162 vehicles per day (2024 count), of which roughly 8% are trucks.

How long is NB I-95 (sr 9) over Lake Ida Road?

The structure is 126 ft (38.5 m) long with a longest span of 126 ft (38.5 m) and a deck 91 ft wide.

Who owns NB I-95 (sr 9) over Lake Ida Road?

It is owned by the State Highway Agency.