US Bridges

NB I 95 to Gateway over None

Good

Palm Beach County, Florida · 700 Ft S of Gateway Blvd · Structure no. 930435

Built
1992
33 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
733 ft
8 main spans
Daily traffic
12,000
2023 count
Owner
State
State Highway Agency

About this bridge

NB I 95 to Gateway over None is a prestressed concrete stringer/multi-beam or girder carrying NB I 95 to Gateway over None in Palm Beach County, Florida. It was built in 1992, so it is 33 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,000 vehicles a day, roughly 5% of them trucks, projected to reach 20,820 by 2042. The structure is 733 ft (223.4 m) long and 51 ft wide. If it were closed, the detour would be 7.5 mi (12 km).

CarriesNB I 95 to Gateway
CrossesNone
Location700 Ft S of Gateway Blvd
RouteInterstate 95
StateFlorida
Coordinates26.54944, -80.07
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating71.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans8
Design loadHS 20 + Mod
Structure length733 ft (223.4 m)
Longest span93 ft (28.4 m)
Deck width51 ft (15.6 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,000 (2023)
Projected traffic20,820 by 2042
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed7.5 mi (12 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was NB I 95 to Gateway over None built?

It was built in 1992, making it 33 years old in 2025.

What condition is NB I 95 to Gateway over None in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does NB I 95 to Gateway over None carry?

About 12,000 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is NB I 95 to Gateway over None?

The structure is 733 ft (223.4 m) long with a longest span of 93 ft (28.4 m) and a deck 51 ft wide.

Who owns NB I 95 to Gateway over None?

It is owned by the State Highway Agency.