SR91 SB Tpk 87.4 over Canal E-2-W(BOYN Bc Int)
GoodPalm Beach County, Florida · At SR 804 SB on Ramp · Structure no. 930432
- Built
- 1992
- 33 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 136 ft
- 3 main spans
- Daily traffic
- 8,150
- 2023 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
SR91 SB Tpk 87.4 over Canal E-2-W(BOYN Bc Int) is a prestressed concrete stringer/multi-beam or girder carrying SR91 SB Tpk 87.4 over Canal E-2-W(BOYN Bc Int) in Palm Beach County, Florida. It was built in 1992, so it is 33 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 8,150 vehicles a day, roughly 14% of them trucks, projected to reach 14,140 by 2042. The structure is 136 ft (41.5 m) long and 31 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR91 SB Tpk 87.4 over Canal E-2-W(BOYN Bc Int) built?
It was built in 1992, making it 33 years old in 2025.
What condition is SR91 SB Tpk 87.4 over Canal E-2-W(BOYN Bc Int) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does SR91 SB Tpk 87.4 over Canal E-2-W(BOYN Bc Int) carry?
About 8,150 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is SR91 SB Tpk 87.4 over Canal E-2-W(BOYN Bc Int)?
The structure is 136 ft (41.5 m) long with a longest span of 76 ft (23.2 m) and a deck 31 ft wide.
Who owns SR91 SB Tpk 87.4 over Canal E-2-W(BOYN Bc Int)?
It is owned by the State Toll Authority.