US Bridges

I 95 NB over W Camino Real

Good

Palm Beach County, Florida · 1.1 Mi. N of Broward Line · Structure no. 930198

Built
1972
53 years old, rebuilt 2020
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
161 ft
3 main spans
Daily traffic
113,500
2024 count
Owner
State
State Highway Agency

About this bridge

I 95 NB over W Camino Real is a prestressed concrete stringer/multi-beam or girder carrying I 95 NB over W Camino Real in Palm Beach County, Florida. It was built in 1972 and reconstructed in 2020, so it is 53 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 113,500 vehicles a day, roughly 10% of them trucks, projected to reach 196,922 by 2046. The structure is 161 ft (49 m) long and 100 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI 95 NB
CrossesW Camino Real
Location1.1 Mi. N of Broward Line
RouteInterstate 95
StateFlorida
Coordinates26.34413, -80.11797
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.8 US tons
Inventory rating36.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length161 ft (49 m)
Longest span92 ft (27.9 m)
Deck width100 ft (30.5 m)
Roadway width100 ft (30.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic113,500 (2024)
Projected traffic196,922 by 2046
Trucks10%
Lanes on structure6
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn an Interstate toll segment under Secretarial agreement
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 95 NB over W Camino Real built?

It was built in 1972, making it 53 years old in 2025. It was reconstructed in 2020.

What condition is I 95 NB over W Camino Real in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does I 95 NB over W Camino Real carry?

About 113,500 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is I 95 NB over W Camino Real?

The structure is 161 ft (49 m) long with a longest span of 92 ft (27.9 m) and a deck 100 ft wide.

Who owns I 95 NB over W Camino Real?

It is owned by the State Highway Agency.