EB SR-710 over C-18 Canal
FairPalm Beach County, Florida · 3.0 MI West of SR-786 · Structure no. 930120
- Built
- 1957
- 68 years old, rebuilt 1988
- Condition
- Fair
- inspected May 2024
- Type
- Slab
- Concrete
- Length
- 120 ft
- 6 main spans
- Daily traffic
- 7,200
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
EB SR-710 over C-18 Canal is a concrete slab carrying EB SR-710 over C-18 Canal in Palm Beach County, Florida. It was built in 1957 and reconstructed in 1988, so it is 68 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,200 vehicles a day, roughly 22% of them trucks, projected to reach 12,492 by 2044. The structure is 120 ft (36.6 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was EB SR-710 over C-18 Canal built?
It was built in 1957, making it 68 years old in 2025. It was reconstructed in 1988.
What condition is EB SR-710 over C-18 Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does EB SR-710 over C-18 Canal carry?
About 7,200 vehicles per day (2024 count), of which roughly 22% are trucks.
How long is EB SR-710 over C-18 Canal?
The structure is 120 ft (36.6 m) long with a longest span of 20 ft (6.1 m) and a deck 43 ft wide.
Who owns EB SR-710 over C-18 Canal?
It is owned by the State Highway Agency.