Simpson RD - CR530 over Boggy Creek
GoodOsceola County, Florida · 0.5 MI N of Osceola Pkwy · Structure no. 924234
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 150 ft
- 1 main span
- Daily traffic
- 30,000
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Simpson RD - CR530 over Boggy Creek is a prestressed concrete stringer/multi-beam or girder carrying Simpson RD - CR530 over Boggy Creek in Osceola County, Florida. It was built in 2023, so it is 2 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 30,000 vehicles a day, roughly 4% of them trucks, projected to reach 52,050 by 2042. The structure is 150 ft (45.7 m) long and 53 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Simpson RD - CR530 over Boggy Creek built?
It was built in 2023, making it 2 years old in 2025.
What condition is Simpson RD - CR530 over Boggy Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does Simpson RD - CR530 over Boggy Creek carry?
About 30,000 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is Simpson RD - CR530 over Boggy Creek?
The structure is 150 ft (45.7 m) long with a longest span of 75 ft (22.9 m) and a deck 53 ft wide.
Who owns Simpson RD - CR530 over Boggy Creek?
It is owned by the County Highway Agency.