US Bridges

Partin Settlement over North Canal to Fish Lake

Good

Osceola County, Florida · 0.4 Miles W of US-192 · Structure no. 924214

Built
2016
9 years old
Condition
Good
inspected April 2024
Type
Culvert
Concrete
Length
23 ft
2 main spans
Daily traffic
10,100
2024 count
Owner
County
County Highway Agency

About this bridge

Partin Settlement over North Canal to Fish Lake is a concrete culvert carrying Partin Settlement over North Canal to Fish Lake in Osceola County, Florida. It was built in 2016, so it is 9 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,100 vehicles a day, roughly 3% of them trucks, projected to reach 17,524 by 2044. The structure is 23 ft (7 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesPartin Settlement
CrossesNorth Canal to Fish Lake
Location0.4 Miles W of US-192
RouteCounty Highway 523
StateFlorida
Coordinates28.27874, -81.34937
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50.8 US tons
Inventory rating39.2 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHL 93
Structure length23 ft (7 m)
Longest span11 ft (3.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,100 (2024)
Projected traffic17,524 by 2044
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Partin Settlement over North Canal to Fish Lake built?

It was built in 2016, making it 9 years old in 2025.

What condition is Partin Settlement over North Canal to Fish Lake in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Partin Settlement over North Canal to Fish Lake carry?

About 10,100 vehicles per day (2024 count), of which roughly 3% are trucks.

How long is Partin Settlement over North Canal to Fish Lake?

The structure is 23 ft (7 m) long with a longest span of 11 ft (3.4 m).

Who owns Partin Settlement over North Canal to Fish Lake?

It is owned by the County Highway Agency.