Bill Beck Blvd. over Mill Slough Creek
GoodOsceola County, Florida · 0.3 MI S. of Osceola Pkwy · Structure no. 924188
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected June 2023
- Type
- Slab
- Concrete Continuous
- Length
- 225 ft
- 7 main spans
- Daily traffic
- 201
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Bill Beck Blvd. over Mill Slough Creek is a concrete continuous slab carrying Bill Beck Blvd. over Mill Slough Creek in Osceola County, Florida. It was built in 2023, so it is 2 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 201 vehicles a day, roughly 5% of them trucks, projected to reach 349 by 2042. The structure is 225 ft (68.6 m) long and 41 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bill Beck Blvd. over Mill Slough Creek built?
It was built in 2023, making it 2 years old in 2025.
What condition is Bill Beck Blvd. over Mill Slough Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does Bill Beck Blvd. over Mill Slough Creek carry?
About 201 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is Bill Beck Blvd. over Mill Slough Creek?
The structure is 225 ft (68.6 m) long with a longest span of 35 ft (10.7 m) and a deck 41 ft wide.
Who owns Bill Beck Blvd. over Mill Slough Creek?
It is owned by the County Highway Agency.