US Bridges

Poinciana Pkwy EB over Reedy Creek

Good

Osceola County, Florida · 4.75MI. N of CR-580 · Structure no. 920214

Built
2023
2 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
6,169 ft
62 main spans
Daily traffic
8,300
2024 count
Owner
Toll Authority
State Toll Authority

About this bridge

Poinciana Pkwy EB over Reedy Creek is a prestressed concrete stringer/multi-beam or girder carrying Poinciana Pkwy EB over Reedy Creek in Osceola County, Florida. It was built in 2023, so it is 2 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,300 vehicles a day, roughly 3% of them trucks, projected to reach 14,401 by 2046. The structure is 6,169 ft (1,880.3 m) long and 45 ft wide.

CarriesPoinciana Pkwy EB
CrossesReedy Creek
Location4.75MI. N of CR-580
StateFlorida
Coordinates28.22552, -81.53204
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.4 US tons
Inventory rating47.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans62
Design loadHL 93
Structure length6,169 ft (1,880.3 m)
Longest span99 ft (30.3 m)
Deck width45 ft (13.6 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,300 (2024)
Projected traffic14,401 by 2046
Trucks3%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a toll road
National Highway SystemNo

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Poinciana Pkwy EB over Reedy Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is Poinciana Pkwy EB over Reedy Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Poinciana Pkwy EB over Reedy Creek carry?

About 8,300 vehicles per day (2024 count), of which roughly 3% are trucks.

How long is Poinciana Pkwy EB over Reedy Creek?

The structure is 6,169 ft (1,880.3 m) long with a longest span of 99 ft (30.3 m) and a deck 45 ft wide.

Who owns Poinciana Pkwy EB over Reedy Creek?

It is owned by the State Toll Authority.