US Bridges

Epcot Center DR WB over Buena Vista Drive

Good

Orange County, Florida · Reedy Creek Imp. Dist · Structure no. 756044

Built
2017
8 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
307 ft
4 main spans
Daily traffic
73,000
2016 count
Owner
Private
Private (other than railroad)

About this bridge

Epcot Center DR WB over Buena Vista Drive is a prestressed concrete stringer/multi-beam or girder carrying Epcot Center DR WB over Buena Vista Drive in Orange County, Florida. It was built in 2017, so it is 8 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 73,000 vehicles a day. The structure is 307 ft (93.6 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEpcot Center DR WB
CrossesBuena Vista Drive
LocationReedy Creek Imp. Dist
RouteCity Street 0
StateFlorida
Coordinates28.36957, -81.53689
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44.6 US tons
Inventory rating38.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length307 ft (93.6 m)
Longest span85 ft (25.9 m)
Deck width59 ft (18 m)
Roadway width56 ft (17.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic73,000 (2016)
Projected traffic—
Trucks—
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerPrivate (other than railroad)
Maintained byPrivate (other than railroad)
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Epcot Center DR WB over Buena Vista Drive built?

It was built in 2017, making it 8 years old in 2025.

What condition is Epcot Center DR WB over Buena Vista Drive in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Epcot Center DR WB over Buena Vista Drive carry?

About 73,000 vehicles per day (2016 count).

How long is Epcot Center DR WB over Buena Vista Drive?

The structure is 307 ft (93.6 m) long with a longest span of 85 ft (25.9 m) and a deck 59 ft wide.

Who owns Epcot Center DR WB over Buena Vista Drive?

It is owned by the Private (other than railroad).