US Bridges

E.B. Beltway Conn. over Permiter Canal

Good

Orange County, Florida · Central Fl Tourism Dist. · Structure no. 756038

Built
2006
19 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
100 ft
1 main span
Daily traffic
14,400
2005 count
Owner
Private
Private (other than railroad)

About this bridge

E.B. Beltway Conn. over Permiter Canal is a prestressed concrete stringer/multi-beam or girder carrying E.B. Beltway Conn. over Permiter Canal in Orange County, Florida. It was built in 2006, so it is 19 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 14,400 vehicles a day, roughly 10% of them trucks, projected to reach 38,900 by 2034. The structure is 100 ft (30.5 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesE.B. Beltway Conn.
CrossesPermiter Canal
LocationCentral Fl Tourism Dist.
StateFlorida
Coordinates28.37809, -81.60707
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating46.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length100 ft (30.5 m)
Longest span98 ft (29.8 m)
Deck width39 ft (11.9 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,400 (2005)
Projected traffic38,900 by 2034
Trucks10%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerPrivate (other than railroad)
Maintained byPrivate (other than railroad)
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was E.B. Beltway Conn. over Permiter Canal built?

It was built in 2006, making it 19 years old in 2025.

What condition is E.B. Beltway Conn. over Permiter Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does E.B. Beltway Conn. over Permiter Canal carry?

About 14,400 vehicles per day (2005 count), of which roughly 10% are trucks.

How long is E.B. Beltway Conn. over Permiter Canal?

The structure is 100 ft (30.5 m) long with a longest span of 98 ft (29.8 m) and a deck 39 ft wide.

Who owns E.B. Beltway Conn. over Permiter Canal?

It is owned by the Private (other than railroad).