Kelvington Drive over LW-9 Drainage Canal
GoodOrange County, Florida · 0.2 MI W of SR-434 · Structure no. 754027
- Built
- 1962
- 63 years old
- Condition
- Good
- inspected September 2023
- Type
- Channel Beam
- Prestressed Concrete
- Length
- 52 ft
- 2 main spans
- Daily traffic
- 2,316
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Kelvington Drive over LW-9 Drainage Canal is a prestressed concrete channel beam carrying Kelvington Drive over LW-9 Drainage Canal in Orange County, Florida. It was built in 1962, so it is 63 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,316 vehicles a day, roughly 5% of them trucks, projected to reach 2,659 by 2042. The structure is 52 ft (15.9 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Kelvington Drive over LW-9 Drainage Canal built?
It was built in 1962, making it 63 years old in 2025.
What condition is Kelvington Drive over LW-9 Drainage Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does Kelvington Drive over LW-9 Drainage Canal carry?
About 2,316 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is Kelvington Drive over LW-9 Drainage Canal?
The structure is 52 ft (15.9 m) long with a longest span of 26 ft (8 m) and a deck 30 ft wide.
Who owns Kelvington Drive over LW-9 Drainage Canal?
It is owned by the County Highway Agency.