SR417 NB Ramp M over SR-417 Ramp C2
GoodOrange County, Florida · 0.48 Mile E of SR 91 · Structure no. 750957
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 1,374 ft
- 6 main spans
- Daily traffic
- 7,900
- 2022 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
SR417 NB Ramp M over SR-417 Ramp C2 is a steel continuous stringer/multi-beam or girder carrying SR417 NB Ramp M over SR-417 Ramp C2 in Orange County, Florida. It was built in 2023, so it is 2 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,900 vehicles a day, roughly 7% of them trucks, projected to reach 13,707 by 2042. The structure is 1,374 ft (418.9 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR417 NB Ramp M over SR-417 Ramp C2 built?
It was built in 2023, making it 2 years old in 2025.
What condition is SR417 NB Ramp M over SR-417 Ramp C2 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does SR417 NB Ramp M over SR-417 Ramp C2 carry?
About 7,900 vehicles per day (2022 count), of which roughly 7% are trucks.
How long is SR417 NB Ramp M over SR-417 Ramp C2?
The structure is 1,374 ft (418.9 m) long with a longest span of 344 ft (104.9 m) and a deck 30 ft wide.
Who owns SR417 NB Ramp M over SR-417 Ramp C2?
It is owned by the State Toll Authority.