US Bridges

Ramp A2-3B over Pond BC-2 to Pond A-6

Good

Orange County, Florida · SR-528 W of SR-436 · Structure no. 750927

Built
2021
4 years old
Condition
Good
inspected February 2024
Type
Culvert
Concrete
Length
22 ft
2 main spans
Daily traffic
5,700
2021 count
Owner
Toll Authority
State Toll Authority

About this bridge

Ramp A2-3B over Pond BC-2 to Pond A-6 is a concrete culvert carrying Ramp A2-3B over Pond BC-2 to Pond A-6 in Orange County, Florida. It was built in 2021, so it is 4 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,700 vehicles a day, roughly 3% of them trucks, projected to reach 9,890 by 2042. The structure is 22 ft (6.6 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRamp A2-3B
CrossesPond BC-2 to Pond A-6
LocationSR-528 W of SR-436
StateFlorida
Coordinates28.45067, -81.31142
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating110.1 US tons
Inventory rating110.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHL 93
Structure length22 ft (6.6 m)
Longest span11 ft (3.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic5,700 (2021)
Projected traffic9,890 by 2042
Trucks3%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Ramp A2-3B over Pond BC-2 to Pond A-6 built?

It was built in 2021, making it 4 years old in 2025.

What condition is Ramp A2-3B over Pond BC-2 to Pond A-6 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Ramp A2-3B over Pond BC-2 to Pond A-6 carry?

About 5,700 vehicles per day (2021 count), of which roughly 3% are trucks.

How long is Ramp A2-3B over Pond BC-2 to Pond A-6?

The structure is 22 ft (6.6 m) long with a longest span of 11 ft (3.3 m).

Who owns Ramp A2-3B over Pond BC-2 to Pond A-6?

It is owned by the State Toll Authority.